Dan Speer Industrial Park Lot 5 Mass Grading project
Barge Design Solutions
1340 Amos Hamlett Rd, Pulaski, TN 38478
The mass grading of Lot 5 to include three phased erosion control and any other Work indicated in the Contract Documents.
Bids Due in 18 days
4/10/25 2:00pm
Cleveland Apron Expansion and Taxiway Connector / SOG Project 3-28-0015-030-2024
Bids Due in 18 days
Barge Design Solutions
Cleveland Municipal Airport, 1021 Airport Terminal Road, Cleveland, MS 38732
The Work includes the following principal items: Expansion of North Ramp, Construction of Connector Taxiway
Bidding Closed
3/17/25 10:00am
ESRA Hangar Site Development
Bidding Closed
Barge Design Solutions
Everett-Stewart Regional Airport, Union City, TN
Scope of work: Base Bid: demolition and earthwork associated with the development of site and construction of future hangar development area. Additive Alternate #1: paving and marking associated with the development of future hangar development area.
Bidding Closed
2/5/25 2:00pm
Water System Improvements DeKalb County, TN
Bidding Closed
Barge Design Solutions
DeKalb County, TN
The Project consists of approximately 6450 linear feet (LF) of 12-inch water main in DeKalb County along Sparta Highway (State Route 70), air release valves, gate valves, fittings, hydrants, together with miscellaneous civil work shown in the Contract Drawings and required for a complete functioning system. The water main installation includes, but is not limited to, three trenchless crossings of Sparta Highway, totaling approximately 179 LF. The project also consists of the development, implementation and maintenance of stormwater erosion and sediment control best management practices to comply with the Tennessee Department of Environment and Conservation General Permit Number TRN100000.
Bidding Closed
2/6/25 1:00pm
Phase II - Sewer Rehabilitation - City of Franklin, KY
Bidding Closed
Barge Design Solutions
City of Franklin, KY
The Project consists of approximately 6,370 feet of cured in place pipe sewer rehabilitation, of which approximately 5,100 feet is 8-inch, 850 feet is 15-inch, and 420 feet is 18-inch; replacing approximately 5,950 feet of existing 6-inch to 8-inch sewer by pipe bursting means; reinstatement of service laterals with approximately 50 by robotic means and 90 by open cut means; and installation of approximately 250 LF of 8-inch PVC gravity sewer.
Bidding Closed
2/6/25 2:00pm
Thompsons Station Regional WWTP Upgrades Phase 2
Bidding Closed
Barge Design Solutions
Thompson’s Station, TN
The Project consists of constructing a new influent pump station, new ultraviolet disinfection system, modifications to the existing lagoon basin, modifications to the existing operations building, new standby generators, and a biosolids dewatering system.
Bidding Closed
2/6/25 2:00pm
V.d. Parrott Jr. Water Treatment Plant High Service Pump Station
Bidding Closed
Barge Design Solutions
Dalton, GA
Demolition of existing high service pumping equipment, piping and structures located in three separate buildings on the site. Construction of a new 48 MGD firm capacity high service pump station and associated yard piping improvements.
Bidding Closed
1/21/25 1:00pm
Ussery Road South Waterline Upgrade
Bidding Closed
Barge Design Solutions
Clarksville, TN
The Project consists of constructing a new 8-inch waterline to upgrade the distribution system along Cumberland Heights Road and Highway 149 extending to the County EMS Station 23. The project consists of approximately 14,000 linear feet of 8-inch polyvinyl chloride waterline.
Bidding Closed
12/19/24 10:00am
Mall and Tacoma Basins Sanitary Sewer Repairs
Bidding Closed
Barge Design Solutions
Auburn, AL
The project consists of approximately 8,760 linear feet of closed circuit television (CCTV) and cured-in-place pipe (CIPP) of 8-inch, 10-inch, and 12-inch gravity sewer mains, 2 protrusion removals, 81 service reinstatements, 440 vertical feet of manhole lining, 7 regrout chimney sections, and 4 rebuild benches.
Bidding Closed
12/12/24 2:00pm
Building 399 Phase 3 Water Services
Bidding Closed
Barge Design Solutions
Columbus, Georgia
The Project consists of installing approximately 135 linear feet of 4-inch ductile iron water pipe, two 4-inch meter assemblies, and two 4-inch backflow preventer assemblies in the Main Post area of Fort Moore off of Wold Avenue.