Public Jobs

Bids Due in 21 days
12/12/24 2:00pm
Building 399 Phase 3 Water Services
Bids Due in 21 days
Barge Design Solutions
Columbus, Georgia
The Project consists of installing approximately 135 linear feet of 4-inch ductile iron water pipe, two 4-inch meter assemblies, and two 4-inch backflow preventer assemblies in the Main Post area of Fort Moore off of Wold Avenue.
Bids Due in 14 days
12/5/24 2:00pm
Storm Sewer Rehabilitation Improvements - City of Cartersville
Bids Due in 14 days
Barge Design Solutions
Cartersville, GA
The Project consists of five different sites with approximately 1,360 feet of storm sewer pipe rehabilitation, with approximately 225 LF of spraycast in 60” CMP, 169 LF of spraycast in 36” CMP, 112 LF of spraycast in 48” CMP, 39 LF of spraycast in 32” x 48” ACMP, 307 LF of spraycast in 42” CMP, and 508 LF of CIPP in 24” CMP. The project also includes various storm structure repairs at the structures on the lines to be rehabilitated.
Bids Due in 14 days
12/5/24 2:00pm
Meadowbrook Water Line Upgrade
Bids Due in 14 days
Barge Design Solutions
Rickman, TN
The Project consists of constructing a new 6-inch water line upgrade within the Meadowbrook Subdivision. The project consists of approximately 5,500 linear feet of 6-inch PVC water line; installation of air release valves; replacement of new service laterals; and installation of associated appurtenances.
Bids Due in 14 days
12/5/24 2:00pm
Bethlehem Road Water Line Extension
Bids Due in 14 days
Barge Design Solutions
Rickman, TN
The Project consists of constructing a new 6-inch water line extension project to upgrade the distribution system along Bilbrey Road and Bethlehem Road. The project consists of approximately 4,700 linear feet of 6-inch PVC water line; installation of air release valves; installation of new service laterals; one creek crossing; and installation of associated appurtenances.
Bids Due in 14 days
12/5/24 2:00pm
Dry Hollow Road Water Line Extension
Bids Due in 14 days
Barge Design Solutions
Rickman, TN
The Project consists of constructing a new 4-inch water line extension project to upgrade the distribution system along Dry Hollow Road. The project consists of approximately 15,300 linear feet of 4-inch PVC water line; installation of two pressure reducing valve vaults; air release valves; installation of new service laterals; and installation of associated appurtenances.
Bidding Closed
11/7/24 10:00am
West Farmville Tank Recoating
Bidding Closed
Barge Design Solutions
Auburn, Alabama
The project consists of abrasive blasting and recoating the bowl interior, abrasive blasting and recoating specified areas inside the column, preparing and recoating dry column valves, fittings, and appurtenances, pressure washing the exterior, recoating the logos, and removing cathodic protection from the 1,000,000 gallon steel fluted column water storage tank.
Bidding Closed
10/29/24 11:00am
Livingston Fuel Farm Relocation
Bidding Closed
Barge Design Solutions
Livingston, TN
Relocate existing fuel farm; construct concrete refueling apron.
Bidding Closed
10/3/24 2:00pm
Guntersville T-Hangars
Bidding Closed
Barge Design Solutions
City Of Guntersville, Alabama
The Work includes the following principal items: 8-Unit T-Hangar
Bidding Closed
9/26/24 2:00pm
Guntersville State Pavement Maintenance
Bidding Closed
Barge Design Solutions
City of Guntersville, Alabama
The Work includes the following principal items: Crack Repair, Seal Coat, Remarking
Bidding Closed
9/17/24 1:00pm
Albertville Pavement Maintenance
Bidding Closed
Barge Design Solutions
City Of Albertville, Alabama
The Work includes the following principal items: Crack Repair, Seal Coat, Remarking