Paces Mill Unit - CRNRA Phase I Improvements
Bids due in 25 days
Barge Design Solutions
Cobb County, GA
The project consists of a new, realigned entry road, removal of existing and construction of a new surface parking area, a large meadow area will replace the existing parking area, there are two large bioswales located in the center of the new parking area, and the entry road will terminate at a new drop-off zone near the main existing boat ramp. The project also includes wood deck river overlooks, site furnishings, two new electronic pay stations, fencing, timber guardrail, landscaping, stormwater and sanitary utility work, as well as construction of a new potable water line.
Bids due in 32 days
8/27/24 2:00pm
Adventure Acres Park Improvements
Bids due in 32 days
Barge Design Solutions
Lafayette, GA
The project site work improvements consist of but not limited to site demolition, clearing and grubbing, erosion and sediment control, earthwork, storm drainage, resurfacing existing asphalt parking lot, striping parking lot, concrete curbs, concrete sidewalks, asphalt walking path, concrete pavers, underground site electrical service to 5’ of the building, site lighting, and landscaping.
Bids due in 32 days
8/27/24 2:00pm
Lower Poplar Water Reclamation Facility - Influent Pump Station
Bids due in 32 days
Barge Design Solutions
Macon, GA
The Project consists of improvements to convert the existing wet well / dry pit pump station into a submersible pump station with six (6) new variable speed submersible wastewater pumps and appurtenances. Four of the pumps will be high-flow pumps, and two will be low-flow pumps to match off-peak duty flow conditions. Isolation valves will be installed on the two pump station effluent force mains. Two magnetic flow meters will be installed in a concrete vault on the force mains. The existing Electrical Building will be demolished, and two prefabricated electrical buildings (eHouses) will be provided to house the variable frequency drives (VFDs), electrical distribution, motor control equipment, and SCADA controls with temperature and humidity control. The Owner is proceeding with early procurement of the new pumps, VFDs, plug valves and actuators, flow meters, and eHouses, to be included in the Contract as Allowance items.
Bids due in 12 days
8/7/24 2:30pm
Flood Abatement Project 19th Street System
Bids due in 12 days
Barge Design Solutions
Columbus, GA
Bids due in 4 days
7/30/24 2:00pm
Arena Road Water Tank
Bids due in 4 days
Barge Design Solutions
City of Crestview, Florida
The project consists of construction a 750,000-gallon elevated ‘composite’ water storage tank, including site preparation, connection piping, fencing, electrical work, and commissioning for a fully functioning system.
Bidding Closed
6/26/24 2:00pm
Birmingham Airport Terminal Apron Concrete Pavement Rehabilitation
Bidding Closed
Barge Design Solutions
Birmingham, Alabama
The work consists of the following principal items of work: spall repair, crack repair, partial slab replacement, joint seal replacement, and pavement marking on the commercial terminal apron at the Birmingham-Shuttlesworth International Airport.
Bidding Closed
6/27/24 10:00am
Auburn Sanitary Sewer Rehabilitation Project (Willow Creek Lake and Auburn University Sewer Basins)
Bidding Closed
Barge Design Solutions
Auburn, AL
The project consists of approximately 8,862 linear feet of closed circuit television (CCTV), 1,666 linear feet of cured-in-place pipe (CIPP) of 8-inch, 24-inch, and 30- inch gravity sewer mains, 1 protrusion removal, 588 vertical feet of manhole lining, 3 chimney section regrouts, and 1 rebuild invert.
Bidding Closed
6/10/24 9:00am
VKS Fuel Farm Taxilane/Term Apron Rehab
Bidding Closed
Barge Design Solutions
Vicksburg, MS
The Work includes the following principal items: Reconstruct Apron Access Taxiway Rehabilitate Terminal Apron
Bidding Closed
5/30/24 2:00pm
North Columbus Water Resource Facility Finished Water Pump and Chemical Improvements
Bidding Closed
Barge Design Solutions
Columbus, GA
The Project includes finished water pumping and chemical feed improvements at North Columbus Water Resource Facility in Columbus, Georgia
Bidding Closed
5/20/24 2:00pm
Williams Street Bridge Replacement
Bidding Closed
Barge Design Solutions
Huntingdon, TN