Sewer Rehabilitation- Phase 1

The Project consists of approximately 11,600 feet of cured in place pipe sewer rehabilitation, of which approximately 9,750 feet is 8-inch,and 1,850 feet is 10-inch; replacing approximately 3,100 feet of existing 8-inch sewer by open-trench replacement; rehabilitation of approximately 120 vertical footage of manholes utilizing epoxy lining; replacement of approximately 15 manholes; reinstatement of approximately 220 service laterals by open cut means; installation of approximately 6,200 feet of 6-inch PVC service lateral pipe; and the restoration of sidewalks, curbs, curbs and gutters, and driveways impacted during construction.
Date Company Contact
1755680097
8/20/25 8:54 am
Ace Pipe Cleaning, Inc.
6601 Univeral Ave
Kansas City, MO 64120
Bobbi Dowland
Contract Manager
Tel: 8162412891
1755861640
8/22/25 11:20 am
Constructconnect
30 Technology Parkway South Suite 100
Norcross, GA 30092
Jemar Sagbigsal
Tel: 3236025079
1755846125
8/22/25 7:02 am
Inliner Solutions, LLC
4520 North State Road 37
Orleans, IN 47452
Linda Andry
Operational Support
Tel: 812 865 3232
Fax: 812 865 307
1755702149
8/20/25 3:02 pm
Portland Utilities Construction Company, LLC
117 Demase Street
PO Box 510
Portland, TN 37148
Joseph F Lehrer
Estimator
Tel: (615) 456-8344