Sewer Rehabilitation- Phase 1

The Project consists of approximately 11,600 feet of cured in place pipe sewer rehabilitation, of which approximately 9,750 feet is 8-inch,and 1,850 feet is 10-inch; replacing approximately 3,100 feet of existing 8-inch sewer by open-trench replacement; rehabilitation of approximately 120 vertical footage of manholes utilizing epoxy lining; replacement of approximately 15 manholes; reinstatement of approximately 220 service laterals by open cut means; installation of approximately 6,200 feet of 6-inch PVC service lateral pipe; and the restoration of sidewalks, curbs, curbs and gutters, and driveways impacted during construction.