Terrell Heights Storm Sewer Improvements Phase 1

The Project consists of storm sewer improvements within the Terrell Heights subdivision. These improvements include 500 feet of cured in place lining of 24-inch corrugated metal pipe, the removal of existing storm sewer and the installation of 95 feet 18-inch reinforced concrete pipe, 80 feet of 24-inch equivalent arch concrete pipe, 234 feet of 36-inch equivalent arch concrete pipe, storm junction boxes, hooded grated inlet, grate inlets, and concrete headwall. The project also includes the relocation of and 60 feet of an existing 6-inch water main and the installation of 60 feet of 8-inch sanitary sewer pipe and sanitary sewer doghouse manhole along with restoration of asphalt paving, curbing, and all other appurtenances and restoration of the project area.
Bid Documents (click to expand/collapse)
Please note Barge Design Solutions is utilizing a new plan room solution. To access documents, you will need to register for a new account with this platform, even if you had a username with the previous system. For questions about accessing the documents please contact plan room support at 901-381-9811.
Name Size
Project Manual 6.1 MB