Terrell Heights Storm Sewer Improvements Phase 1

The Project consists of storm sewer improvements within the Terrell Heights subdivision. These improvements include 500 feet of cured in place lining of 24-inch corrugated metal pipe, the removal of existing storm sewer and the installation of 95 feet 18-inch reinforced concrete pipe, 80 feet of 24-inch equivalent arch concrete pipe, 234 feet of 36-inch equivalent arch concrete pipe, storm junction boxes, hooded grated inlet, grate inlets, and concrete headwall. The project also includes the relocation of and 60 feet of an existing 6-inch water main and the installation of 60 feet of 8-inch sanitary sewer pipe and sanitary sewer doghouse manhole along with restoration of asphalt paving, curbing, and all other appurtenances and restoration of the project area.
Bid Documents (click to expand/collapse)
Please note Barge Design Solutions is utilizing a new plan room solution. To access documents, you will need to register for a new account with this platform, even if you had a username with the previous system. For questions about accessing the documents please contact plan room support at 901-381-9811.
Name Size
001 G0.00 428.4 KB
002 G0.01 161.8 KB
003 G0.02 735.7 KB
004 C1.01 301.6 KB
005 C1.02 450.9 KB
006 C1.03 540.7 KB
007 C2.01 508.8 KB
008 C5.01 2.0 MB
009 C5.02 1.7 MB
010 C5.03 2.4 MB
011 C5.04 3.3 MB
012 C5.05 1.4 MB
013 EC0.01 820.1 KB
014 EC1.01 364.1 KB
015 EC1.02 401.9 KB
016 EC5.01 710.3 KB
017 EC5.02 676.2 KB