NOUD - Stover Road Water Line Upgrade

The Project consists of constructing a new 8-inch water line extension project to upgrade its distribution system along Independence Road and Stover Road between Oakley Allen Road and State Route 294. The project consists of approximately 18,000 linear feet of 8-inch water line; installation of two pressure reducing valve vaults; air release valves; replacement of service laterals; and installation of associated appurtenances.

Status

Bidding Closed

Bid Date 1/24/24 1:00pm

Company & Contacts

Barge Design Solutions
Ashley Glass  
(615) 252-4365

Location

Allons, Tennessee

Bid Information:

Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the construction of the Stover Road Water Line Upgrade will be received at the North Overton Utility District office, located at 110 Hoover Cemetery Road, until 1:00 p.m., local time, on January 24, 2024, and then at said location publicly opened and read aloud.


Pre-Bid Information:

A Pre-Bid Conference will be held if so indicated in the Advertisement for Bids. Oral statements may not be relied upon and will not be binding or legally effective.


For questions about ordering documents, call Memphis Reprographics at 901-381-9811. Call prior to picking up documents to ensure availability. Partial sets of Bidding Documents will not be available directly from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of bidding Documents including Addenda, if any, obtained from sources other than the Issuing Office. No part of the purchase will be refunded.