Water Main Replacement Program Phase 2
The Project consists of replacing approximately 16,870 linear feet (LF) of water main in downtown Loudon, Tennessee. The water main will be constructed of ductile iron pipe ranging from 4-inch to 12-inch in size. The project includes but is not limited to valves, fittings, hydrants and other appurtenances as shown on the Drawings and required for a complete functioning system.
Plan Holders
Date | Company | Contact |
3/19/24 3:04 pm | Constructconnect
30 Technology Parkway South Suite 100 Norcross, GA 30092 | Jemar Sagbigsal Tel: 3236025079 |
3/14/24 9:31 am | Hurst Excavating
PO Box 5374 Knoxville, TN 37928 | TREY BROGDON Tel: 8653564903 |
3/18/24 9:27 am | Merkel Bros. Construction, Inc
PO BOX 370 GREENEVILLE, TN 37744-0370 | Patti Neas Tel: 4236393116 |
3/19/24 12:42 pm | Morgan Contracting, Inc.
900 Dutch Valley Drive Knoxville, TN 37918 | Norma George-Ferrara Preconstruction Manager Tel: 865-249-8640 Fax: 865-249-8651 |
3/14/24 11:51 am | Norris Brothers Excavating LLC
22 Northside Lane Crossville, TN, TN 38571 | Jacob Norris Owner Tel: 9312776556 |
3/18/24 7:28 am | PRI of East TN, Inc
5651 S. National Drive Knoxville, TN 37914 | Angie Davis 865-210-2692 Estimator Tel: 8652102692 |