West Farmville Tank Recoating

The project consists of abrasive blasting and recoating the bowl interior, abrasive blasting and recoating specified areas inside the column, preparing and recoating dry column valves, fittings, and appurtenances, pressure washing the exterior, recoating the logos, and removing cathodic protection from the 1,000,000 gallon steel fluted column water storage tank.

Status

Bidding Closed

Bid Date 11/7/24 10:00am

Company & Contacts

Barge Design Solutions
Morgan Bell  
334.707.2337

Location

Auburn, Alabama

Bid Information:

Copies of the Bidding Documents may be purchased from Memphis Reprographics as follows bidding.bargedesign.com or via phone at (901) 381-9811. Cost of Bidding Documents is $75.00 per set. The deposit shall be refunded in full to each prime contractor bidder upon return of the documents in reusable condition within 10 days after bid opening. Additional sets for prime contractor bidders, subcontractors, vendors, or dealers may be obtained upon payment of the same deposit. The deposit shall be refunded less the cost of printing, reproduction, handling, and distribution, upon return of the documents in reusable condition within 10 days after bid opening.

FOR SPECIFIC INFORMATION CONCERNING THIS PROJECT, PLEASE CONTACT MORGAN BELL, P.E., PROJECT ENGINEER, BARGE DESIGN SOLUTIONS, INC. AT 334.707.2337 or Morgan.Bell@bargedesign.com.