Water Main Replacement Program Phase 2
The Project consists of replacing approximately 16,870 linear feet (LF) of water main in downtown Loudon, Tennessee. The water main will be constructed of ductile iron pipe ranging from 4-inch to 12-inch in size. The project includes but is not limited to valves, fittings, hydrants and other appurtenances as shown on the Drawings and required for a complete functioning system.
Addenda
(click to expand/collapse)
All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed, delivered or otherwise issued to all parties recorded by Engineer as having received the Bidding Documents.
Questions received less than ten days prior to the date for opening of Bids may not be answered. Oral and other interpretations or clarifications will be without legal effect.
Questions received less than ten days prior to the date for opening of Bids may not be answered. Oral and other interpretations or clarifications will be without legal effect.
Name | Size | |||
Addendum No. 1 | 4.2 MB |