Matlock Bend 1 MG Tank and Roberson BPS Upgrades

The Project consists of constructing a 1MG ground storage tank at the existing Matlock Bend Tank site.
Bid Documents (click to expand/collapse)
Partial sets of Bidding Documents will not be available directly from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of bidding Documents including Addenda, if any, obtained from sources other than the Issuing Office. No part of the purchase will be refunded.
Name Size
001 COVER 917.3 KB
002 G0.01 408.3 KB
003 C1.01 265.4 KB
004 C1.02 322.3 KB
005 C2.01 510.6 KB
006 C2.02 393.5 KB
007 C5.01 338.0 KB
008 C5.02 328.1 KB
009 C5.03 1.0 MB
010 C5.04 2.5 MB
011 D1.01 287.9 KB
012 D1.02 746.6 KB
013 DI0.01 424.8 KB
014 DI0.02 442.9 KB
015 DI0.03 417.3 KB
016 DI0.21 360.4 KB
017 DI0.31 345.8 KB
018 E0.01 235.2 KB
019 E1.01 265.3 KB
020 E6.01 418.9 KB
021 E6.02 191.8 KB
022 E9.01 892.9 KB