Phase II - Sewer Rehabilitation - City of Franklin, KY
The Project consists of approximately 6,370 feet of cured in place pipe sewer rehabilitation, of which approximately 5,100 feet is 8-inch, 850 feet is 15-inch, and 420 feet is 18-inch; replacing approximately 5,950 feet of existing 6-inch to 8-inch sewer by pipe bursting means; reinstatement of service laterals with approximately 50 by robotic means and 90 by open cut means; and installation of approximately 250 LF of 8-inch PVC gravity sewer.
Plan Holders
Date | Company | Contact |
1/7/25 7:04 am |
Barge Design Solutions
60 Germantown Court Suite 100 Cordova, TN 38018 |
Patrick Stephens
Tel: 901-755-7166
Fax: 901-755-7844
|
1/10/25 9:10 am |
Bobby Luttrell and Sons, LLC
190 Bank Circle Drive Dundee, KY 42338 |
Shane Goins
Tel: 270.276.9439
Fax: 270-276-9439
|
1/6/25 12:27 pm |
Constructconnect
30 Technology Parkway South Suite 100 Norcross, GA 30092 |
Jemar Sagbigsal
Tel: 3236025079
|
1/6/25 12:02 pm |
Moore Construction Co., INC
P.O. Box 691 Clarksville, TN 37041-0691 |
Chris Clinard
Project Manager
Tel: 9316481196
Fax: 9316476756
|
2/4/25 9:51 am |
Musson Bros., Inc.
1522 Pearl Street Waukesha, WI 53186 |
Cynthia Czekalski
Administrative Assistant
Tel: 2627905060
Fax: 2627905069
|
1/23/25 3:50 pm |
Portland Utilities Construction Company, LLC
117 Demase Street PO Box 510 Portland, TN 37148 |
Tracy Weaver
Contract Manager
Tel: 615-325-3374
|
2/1/25 11:25 am |
SLB Pipe Solutions LLC
2900 Mitchell Rd. Bedford, IN 47421 |
John Thomas
Project Manager
Tel: 8126759874
|
1/13/25 10:10 am |
Underground Solutions
13135 Danielson Street Suite 201 Poway, CA 92064 |
Karon Williams
Tel: 9852440783
|