Lower Poplar Water Reclamation Facility - Influent Pump Station

The Project consists of improvements to convert the existing wet well / dry pit pump station into a submersible pump station with six (6) new variable speed submersible wastewater pumps and appurtenances. Four of the pumps will be high-flow pumps, and two will be low-flow pumps to match off-peak duty flow conditions. Isolation valves will be installed on the two pump station effluent force mains. Two magnetic flow meters will be installed in a concrete vault on the force mains. The existing Electrical Building will be demolished, and two prefabricated electrical buildings (eHouses) will be provided to house the variable frequency drives (VFDs), electrical distribution, motor control equipment, and SCADA controls with temperature and humidity control. The Owner is proceeding with early procurement of the new pumps, VFDs, plug valves and actuators, flow meters, and eHouses, to be included in the Contract as Allowance items.
Date Company Contact
1723470055
8/12/24 1:40 pm
Haren Construction Company, Inc. 1715 Highway 411 North
Etowah, TN 37331
Cindy Osborne
Tel: 423-263-5561
Fax: 423-263-5573
1721289779
7/18/24 8:02 am
Lakeshore Engineering, LLC 1259 Ellsworth Dr NW
ATLANTA, GA 30318
Garland Long
Tel: 4043553976
1720773687
7/12/24 8:41 am
Parrish Construction Group, Inc. 221 Industrial Park Drive
Perry, GA 31069
Stephen Mock
Tel: (478) 286-1416
1720787641
7/12/24 12:34 pm
R2T, Inc. Suite 101
580 W. Crossville Road
Roswell, GA 30075
Nadya Collins
Tel: 7705697038
1720779582
7/12/24 10:19 am
Ruby-Collins Inc 4875 Martin Court SE, Smyrna, GA 30082
Smyrna, GA 30082
Nikki Carr
Tel: 7704322900
Fax: 7704328238