Birmingham Airport Terminal Apron Concrete Pavement Rehabilitation
The work consists of the following principal items of work: spall repair, crack repair, partial slab replacement, joint seal replacement, and pavement marking on the commercial terminal apron at the Birmingham-Shuttlesworth International Airport.
Addenda
(click to expand/collapse)
No interpretation of the Plans, Specifications or other Contract Documents or correction of any apparent ambiguity, inconsistency, or error therein, will be made to any individual Bidder. Every request for an interpretation or correction MUST be in writing, addressed to Barge Design Solutions, 500 Corporate Parkway, Suite 500, Hoover, AL 35242 or chris.grace@bargedesign.com and must be received at least seven (7) Calendar Days prior to the date fixed for the opening of Bids.
Name | Size | |||
Addendum No. 1 | 5.5 MB | |||
Addendum No. 2 | 1.0 MB |