Auburn Sanitary Sewer Rehabilitation Project (Willow Creek Lake and Auburn University Sewer Basins)

The project consists of approximately 8,862 linear feet of closed circuit television (CCTV), 1,666 linear feet of cured-in-place pipe (CIPP) of 8-inch, 24-inch, and 30- inch gravity sewer mains, 1 protrusion removal, 588 vertical feet of manhole lining, 3 chimney section regrouts, and 1 rebuild invert.

Status

Bidding Closed

Bid Date6/27/24 10:00am

Company & Contacts

Barge Design Solutions
Meghan Simmons  
(706) 321-4590

Location

Auburn, AL

The City of Auburn, Alabama, (herein after referred to as City) will receive sealed bids until 10:00 a.m., local time, on Thursday, June 27, 2024 in the City Meeting Room, 144 Tichenor Avenue, Auburn, Alabama, and then publicly opened and read for furnishing all labor, materials and equipment necessary for the completion of the following project:

AUBURN SANITARY SEWER REHABILITATION PROJECT

(WILLOW CREEK LAKE AND AUBURN UNIVERSITY SEWER BASINS)

FOR SPECIFIC INFORMATION CONCERNING THIS PROJECT, PLEASE CONTACT MORGAN BELL, P.E., ENGINEERING MANAGER, BARGE DESIGN SOLUTIONS, INC. AT 334.707.2337 or Morgan.Bell@bargedesign.com.