Terrell Heights - Phase 2
The Project consists of storm sewer and sanitary sewer improvements within the Terrell Heights subdivision. These improvements include the installation of 335 LF of 8” HDPE pipe via pipe bursting, 30 LF of 6” PVC pipe, 680 LF of 36” RCP, 300 LF of 44” x 27” Arch RCP (36” Equivalent), one concrete headwall, six 60” junction boxes, and two 60” junction box grate inlets. Included in the improvements is also the relocation of 70 LF of a 6” DIP water main along with restoration of asphalt paving, curbing, and all other appurtenances in addition to general restoration of the project area. Additive to this project is the demolition and removal of a driveway, fence, and 15 linear feet (LF) of 18” RCP on the 115 Woodland Drive property. Also additive to the project is the installation of one stormwater storage pond with OCS, grading, and retaining wall.
Bid Documents
(click to expand/collapse)
For questions about accessing the documents please contact Memphis Reprographics at 901-381-9811.
Name | Size | ||
001 G0.00 | 2.2 MB | ||
002 G0.01 | 218.7 KB | ||
003 G0.02 | 524.8 KB | ||
004 C1.01 | 575.8 KB | ||
005 C1.02 | 438.4 KB | ||
006 C1.03 | 487.3 KB | ||
007 C1.04 | 423.6 KB | ||
008 C5.01 | 395.9 KB | ||
009 C5.02 | 2.0 MB | ||
010 C5.03 | 2.4 MB | ||
011 C5.04 | 3.3 MB | ||
012 C5.05 | 3.7 MB | ||
013 C5.06 | 1.6 MB | ||
014 EC0.01 | 877.8 KB | ||
015 EC1.01 | 719.2 KB | ||
016 EC1.02 | 656.8 KB | ||
017 EC5.01 | 766.8 KB | ||
018 EC5.02 | 659.5 KB | ||
019 EC5.03 | 311.7 KB |