Terrell Heights - Phase 2

The Project consists of storm sewer and sanitary sewer improvements within the Terrell Heights subdivision. These improvements include the installation of 335 LF of 8” HDPE pipe via pipe bursting, 30 LF of 6” PVC pipe, 680 LF of 36” RCP, 300 LF of 44” x 27” Arch RCP (36” Equivalent), one concrete headwall, six 60” junction boxes, and two 60” junction box grate inlets. Included in the improvements is also the relocation of 70 LF of a 6” DIP water main along with restoration of asphalt paving, curbing, and all other appurtenances in addition to general restoration of the project area. Additive to this project is the demolition and removal of a driveway, fence, and 15 linear feet (LF) of 18” RCP on the 115 Woodland Drive property. Also additive to the project is the installation of one stormwater storage pond with OCS, grading, and retaining wall.
Date Company Contact
1714051621
4/25/24 1:27 pm
C. W. Matthews Contracting Co., Inc. 1600 Kenview Drive
Marietta, GA 30060
Brenda Nation
Admin Assist
Tel: 770-422-7520
Fax: 770-422-9361
1713272336
4/16/24 12:58 pm
Complete Site 3510 Ballground Hwy
Suite 1000
Canton, GA 30114
Jeremiah Edelen
Estimator
Tel: 6784904911
1712921516
4/12/24 11:31 am
Constructconnect 30 Technology Parkway South Suite 100
Norcross, GA 30092
Jemar Sagbigsal
Tel: 3236025079
1713354190
4/17/24 11:43 am
HD Excavations & Utilities LLC PO Box 489
Villa Rica, GA 30180
Wesley Dickinson
Owner
Tel: 4048526817
Fax: na
1713945452
4/24/24 7:57 am
RDJE INC 679 Highway 29 S.
Suite A
Newnan, GA 30263
Amanda Simpson
Contracts Admin
Tel: 7702512667
1711617189
3/28/24 9:13 am
Site Engineering 7025 Best Friend Road
Atlanta, GA 30340
Tamara Isbell
Tel: 770-263-7234