Terrell Heights - Phase 2
The Project consists of storm sewer and sanitary sewer improvements within the Terrell Heights subdivision. These improvements include the installation of 335 LF of 8” HDPE pipe via pipe bursting, 30 LF of 6” PVC pipe, 680 LF of 36” RCP, 300 LF of 44” x 27” Arch RCP (36” Equivalent), one concrete headwall, six 60” junction boxes, and two 60” junction box grate inlets. Included in the improvements is also the relocation of 70 LF of a 6” DIP water main along with restoration of asphalt paving, curbing, and all other appurtenances in addition to general restoration of the project area. Additive to this project is the demolition and removal of a driveway, fence, and 15 linear feet (LF) of 18” RCP on the 115 Woodland Drive property. Also additive to the project is the installation of one stormwater storage pond with OCS, grading, and retaining wall.
Plan Holders
Date | Company | Contact |
4/25/24 1:27 pm |
C. W. Matthews Contracting Co., Inc.
1600 Kenview Drive Marietta, GA 30060 |
Brenda Nation
Admin Assist
Tel: 770-422-7520
Fax: 770-422-9361
|
4/16/24 12:58 pm |
Complete Site
3510 Ballground Hwy Suite 1000 Canton, GA 30114 |
Jeremiah Edelen
Estimator
Tel: 6784904911
|
4/12/24 11:31 am |
Constructconnect
30 Technology Parkway South Suite 100 Norcross, GA 30092 |
Jemar Sagbigsal
Tel: 3236025079
|
4/17/24 11:43 am |
HD Excavations & Utilities LLC
PO Box 489 Villa Rica, GA 30180 |
Wesley Dickinson
Owner
Tel: 4048526817
Fax: na
|
4/24/24 7:57 am |
RDJE INC
679 Highway 29 S. Suite A Newnan, GA 30263 |
Amanda Simpson
Contracts Admin
Tel: 7702512667
|
3/28/24 9:13 am |
Site Engineering
7025 Best Friend Road Atlanta, GA 30340 |
Tamara Isbell
Tel: 770-263-7234
|